MC SYSTEM ADVANTAGES

LOWER PRICE OF CONSTRUCTION

Enable the saving of min. 20% compared to buildings with the same energy efficiency and fire resistance properties made by any other building system. As bigger the constructed building is the bigger the savings are.

MC system in comparison to the existing RC building systems uses at least 30% less cement and 31% less steel. Additional savings are realized in the process of transportation and installation according significantly less dead weight (about 50%). The building built by this system is entirely subject to recycling.

The MC construction system provides energy savings throughout the every phase of building lifecycle: 30% in construction, 50% in exploitation  and 50% in maintenance.

%

LOWER PRICE OF CONSTRUCTION

LOWER MAINTENACE AND OPERATING COSTS

Favorable ratio of floor area to volume of building minimize surface of external walls and heat losses. Also reducing undesired overheating during summer enabling energy savings for heating and AC.

Windows on slopes, although smaller in size provide same illumination of the interior as would three times bigger on vertical walls additionally reducing heat losses.

Buildings constructed by MC System provide 50% less heat losses in comparison with squared buildings of the same floor surface and volume with the same insulation properties.

Effects of dynamic loads and winds are drastically reduced by this form. Buildings can sustain any snow load and wind simply slides over the object. There are no elements which can corrode or be separated from RC construction, such metal sheets, roof tiles, flashings, gutters or similar r metal sheets that could be separated from the structure. All maintenance of buildings comes down to applying of a layer of hydro insulating paint referring to manufacturer’s instructions using integrated wheeled scaffolding (without additional cost of scaffolding)

%

LOWER MAINTENACE AND OPERATING COSTS

FASTER BUILDING

MC system provides quick and easy construction of high quality, energy efficient durable buildings. Elements are produced in controlled environment in uniform quality and enables significantly faster building on the site. By MC System hall of 1000m2 floor area can be build in just 15 working days on pre constructed foundations. Subsequently all finishing and internal works are performed in closed space and controlled environment disregarding out weather conditions implying very short construction deadline.

%